[Construction Manual] Construction Manual Updates-Manual Change Transmittal 12-3 Issued

Construction Publications construction_publications at dot.ca.gov
Mon Aug 27 14:20:59 PDT 2012


Dear Construction Subscriber,

You are receiving this message from the Division of Construction
Publications Unit because you have subscribed to our Construction Manual
and other publications updates.

Manual Change Transmittal (MCT) 12-3 has been issued for Construction
Manual Sections 4-16, 4-49, and 4-50. It is posted at:

   http://www.dot.ca.gov/hq/construc/manual2001/MCTindex.htm

MCT 12-3 has been incorporated into the 2001 version of the Construction
Manual [Complete Download] and the document has been posted with an August
2012 date. As each transmittal is incorporated, a new date will appear for
the complete download and for sections, in the "Current Manual Section"
column on our website. The manual's index has been temporarily removed and
will be updated and republished when the revisions are completed. Hard
copies of the newly issued MCTs and complete downloads will not be
available during the update process.

Manual sections have been revised as a result of Standard Specification,
policy, and procedural changes and may contain updated language,
information, corrections, and references. Bracketed Standard Specification
section
numbers refer to the 2006 Standard Specifications. Change lines located in
the margin of the sections indicate that text has been added, moved, or
corrected. Below are summaries of the sections issued with this MCT.

The complete manual and sections are posted on our website:

   http://www.dot.ca.gov/hq/construc/constmanual/

Section 4-16, “Clearing and Grubbing”

   Updates section to align with 2010 Standard Specifications, including:
       Deletes requirement to treat scars resulting from removal of
          branches.
       Deletes limitation on payment for clearing and grubbing.

Section 4-49, “Piling”

       Updates section to align with 2010 Standard Specifications,
          including changing SI units to US customary units.
       Eliminates CPD 03-4, “Pile Driving Acceptance Criteria,” because it
          is no longer needed.

Section 4-50, “Prestressing Concrete”

Updates reference to align with 2010 Standard Specifications.


To unsubscribe from these updates, follow the directions at the bottom
   of
   this webpage:


http://lists.dot.ca.gov/mailman/listinfo/construction-manual-updates-announce



More information about the Construction-Manual-Updates-Announce mailing list