Dear Subscriber,

We have posted Construction Procedure Directive 16-14, "Reinstatement of SRT Systems and Rescission of Construction Procedure Directive 16-11," on our website:
http://www.dot.ca.gov/hq/construc/CPDirectives/cpdindex.htm

This directive rescinds Construction Procedure Directive 16-11, "Suspension of the SRT-350, SRT-27SP and SRT-31 Guardrail End Treatments," and provides guidance for resuming installation of these slotted rail terminal (SRT) systems. Resident engineers must verify the systems are marked with directional labels and are installed in accordance with supplemental installation instructions provided by the manufacturer. A memorandum from the Division of Traffic Operations is included.

Construction Publications

To unsubscribe from these updates, follow the directions at the bottom of this webpage:
http://lists.dot.ca.gov/mailman/listinfo/construction-manual-updates-announce

_______________________________________________
Construction-Manual-Updates-Announce mailing list
Construction-Manual-Updates-Announce at lists.dot.ca.gov<mailto:Construction-Manual-Updates-Announce at lists.dot.ca.gov>
http://lists.dot.ca.gov/mailman/listinfo/construction-manual-updates-announce
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.dot.ca.gov/pipermail/construction-manual-updates-announce/attachments/20161031/abc7d8f9/attachment.html


More information about the Construction-Manual-Updates-Announce mailing list